EZ100 for conduits Ø 50 - 150 mm
EZ100 Pull Line Blower
The Pull Line Blower EZ100 by Zeitler has been developed especially for network construction such as civil engineering, ground work, roads, tunnels, bridges, etc.
It is suitable for cable ducts from Ø 50 to 150 mm (internal diameter).
The pull line might be blown or aspirated. Water, small residues, impurities or else can often be pushed through with the shuttle in only one operation.
Facts
- Blow pull line (tensile strength up to 300 kg) without compressor
- For all commercial pipe work (internal diameter from 50 to 150 mm)
- With special equipment also for small diameters from 25 mm
- For all network construction such as civil engineering, ground work, roads, tunnels, bridges
- For lengths of 1000 m and more (current record 2’850 m)
- Huge time saving in cable feeding: Cleaning, taking water out, calibrating and line feeding in one step
- Lightweight and compact
- Excellent accessibility, even in confined spaces
- Easy to handle
- Double function (blowing and suction mode)
- Suitable in any car boot
- Value for money
Application
- Conduit ends must be clean and cut off evenly
- Firstly, blow air trough the conduit without shuttle, check if penetrable tube/correct tube
- Assemble shuttle correspending exactly to the Ø int. of tube
- Insert pull line through pull line supply and knot it tightly to the shuttle
- Place shuttle in the conduit and press EZ100 to the conduit, the front being movable for 360°
- Blow shuttle troug without interrupting
- Attach either cable/s or extra strong pull line and start pulling
Standard equipment in strong plastic case
- 1 x Pull Line Blower EZ100
- 2 x special pull line rolls (Ø 1 mm, tensile strength approx 24 kg, roll of approx 900 m)
- 1 x suction unit
- 5 x small cases with equipment to fix 2 shuttles of each dimension (free selection of 5 diameters 25-150 mm)
- 1 x box with assembly material for shuttles
- 1 x Operating instructions